
YouThought Milestones
2025
2024
2023
2022
2020
2019
2018
2017
2016
2014
• Gudeng Precision adopted u-APS to enhance cross-site capacity planning and production coordination.
• Taiwan Bio Therapeutics implemented u-APS, replacing manual scheduling with an AI optimization engine to automate order, manpower, and equipment planning.
• KINSUS adopted u-APS to optimize complex process scheduling, enhancing capacity utilization and improving on-time delivery performance.
• GCE adopted u-APS to optimize bottleneck workstation scheduling and enhance overall production planning.
• X-FAB implemented u-Planning and u-Efficiency to strengthen production planning and performance improvement initiatives.
Nexchip adopted YouThought’s u-Planning and expanded the deployment of u-Optimizer across the entire fab.
• TSMC engaged YouThought as a consulting partner for the development of its planning system.
• Successfully implemented u-Optimizer at VIS (Vanguard International Semiconductor), leading the industry in deploying smart scheduling in a non-fully automated 8-inch fab.
• Successfully deployed u-Optimizer in the lithography and furnace areas at Nexchip’s 12-inch fab.
• BOE Fuzhou (B10 panel fab) was selected as a Lighthouse Factory based on the successful implementation of YouThought’s solutions.
• Began project collaboration with our China distributor XinXiang, establishing a model in which the distributor provides front-end customer support.
The third product, u-Planning, was launched.
Shin Puu Technology, a PCB manufacturer, invested in YouThought.
Successfully deployed u-Optimizer at USCXM’s 12-inch fab in Xiamen.
• Launched the second product, u-Optimizer.
• Successfully expanded product adoption to TCL CSOT, a leading display manufacturer in China.
• Successfully implemented u-Efficiency across all TSMC 8-inch fabs, providing quantitative indicators and evaluation metrics for identifying efficiency improvement opportunities.
• Successfully deployed u-Efficiency at UMC’s 8-inch fab, achieving a 10% Cycle Time reduction within six months.
• Successfully implemented u-Efficiency at BOE, enabling process optimization and maximizing line performance through real-time utilization monitoring and bottleneck analysis.
Launched the first product, u-Efficiency.
