top of page

YouThought Milestones

2025

2024

2023

2022

2020

2019

2018

2017

2016

2014

• Gudeng Precision adopted u-APS to enhance cross-site capacity planning and production       coordination.

• Taiwan Bio Therapeutics implemented u-APS, replacing manual scheduling with an AI optimization engine to automate order, manpower, and equipment planning.

• KINSUS adopted u-APS to optimize complex process scheduling, enhancing capacity utilization and improving on-time delivery performance.

• GCE adopted u-APS to optimize bottleneck workstation scheduling and enhance overall production planning.

• X-FAB implemented u-Planning and u-Efficiency to strengthen production planning and performance improvement initiatives.

Nexchip adopted YouThought’s u-Planning and expanded the deployment of u-Optimizer across the entire fab.

• TSMC engaged YouThought as a consulting partner for the development of its planning system.

• Successfully implemented u-Optimizer at VIS (Vanguard International Semiconductor), leading the industry in deploying smart scheduling in a non-fully automated 8-inch fab.

• Successfully deployed u-Optimizer in the lithography and furnace areas at Nexchip’s 12-inch fab.

• BOE Fuzhou (B10 panel fab) was selected as a Lighthouse Factory based on the successful implementation of YouThought’s solutions.

• Began project collaboration with our China distributor XinXiang, establishing a model in which the distributor provides front-end customer support.

The third product, u-Planning, was launched.

Shin Puu Technology, a PCB manufacturer, invested in YouThought.

Successfully deployed u-Optimizer at USCXM’s 12-inch fab in Xiamen.

• Launched the second product, u-Optimizer.

• Successfully expanded product adoption to TCL CSOT, a leading display manufacturer in China.

• Successfully implemented u-Efficiency across all TSMC 8-inch fabs, providing quantitative indicators and evaluation metrics for identifying efficiency improvement opportunities.

• Successfully deployed u-Efficiency at UMC’s 8-inch fab, achieving a 10% Cycle Time reduction within six months.

• Successfully implemented u-Efficiency at BOE, enabling process optimization and maximizing line performance through real-time utilization monitoring and bottleneck analysis.

Launched the first product, u-Efficiency.

bottom of page